50 YEARS OF OPERATION 3 5 1.  Technicians working in the (TRA) Hot Cells. 2.  Working with an In-Pile Tube Strongback on the main floor of ATR. 3.  Attendees of the 30th anniversary celebration. 4.  Laboratory in the basement of MTR. 5.  Installation of the Loop Operating Control Station. 4